Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Well presents with casing, tubing and rods. Flow line is not connected. There is a concrete slab with no pumping unit. Casing and tubing are secured with valves and bull plugs. Well is inactive and shut in.
|