Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Fluid level test conducted on 9/8 = Tubing - 5417' @ 427 PSI, Casing - 4094' @ 427 PSI, produced water tank and compressor have been recently removed, clean location.
|