Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Production well the chemical agent has been disconnected from the well system there is a well sign at the lease entrance and the fluids tank which appears to be re-connected to the well system is still broken approximately 6” of storm water in the secondary containment.
|