Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Fluid level test conducted on 9/19 = Tubing - 2864' @ 362 PSI, Casing - 2821' @ 363 PSI, location has not produced in over ten years, no activity since last FLT of 05/2017, vegetation has been cleared, produced water tank is still overturned. No enforcement at this time.MP
|