Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
The IOPT results for the new producing well 178 PSI at the flow line with 295 MCF and the 24-hour flow rate was 220 MCFD approximately 6" of storm water in the secondary containment the compressor was not running during the inspection there are frac trailers on location the reserve pit appears to be remediated a clean site.
|