Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Fluid level test conducted on 09/15 = Tubing - 5514' @ 453 PSI, Casing - 4063' @ 455 PSI, signs at entry and wellhead have been torn off, clean location.
|