Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Fluid level test conducted on 9/12 = Tubing (1 1/4") 3837' @ 140 PSI, Casing (2 7/8") 1894' @ 50 PSI, methanol tank is still connected, clean location.
|