Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Fir is for TA fluid test. The tubing was 2102 ft @ 494 PSI and the Casing was 1223 @ 485 PSI. The site has vegetation and the lease road also have vegetation and washouts.
|