Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Fluid level test conducted on 8/25 = Tubing - 5504' @ 345 PSI, Casing - 2266' @ 57 PSI, plunger in well head, water tank is sitting outside of containment ring, excessive vegetation over location.
|