Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Producing well the AOGC inspector could inspect this well unable to unlock the combination locks on the gate by using the 23 codes that were provided. (RJS - Operator contacted 9-29-2022)
|