Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
FLT for temporary abandoned producing well casing line pressure was 246 PSI with the fluid level @ 3793’ and the tubing pressure was 251 PSI with the fluid level was 2294’ approximately 1” - 3” of storm water in the secondary containment no flow meter on location.
|