Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
FLT for temporary abandoned production well casing line pressure was 108 PSI with the fluid level @ 1997’ the tubing pressure was 183 PSI with the fluid level was 3408’ approximately 1” - 3” of storm water in the secondary containment.
|