Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
FLT on abandoned production well casing line pressure was 396 PSI with the fluid level @ 755’ the tubing pressure was 417 PSI with the fluid level was 1969’ approximately 8” of storm water in the secondary containment no flow meter on site.
|