Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
FLT for temporary abandoned producing well casing line pressure was 129 PSI with the fluid level @ 7279’ the tubing pressure was 127 PSI with the fluid level was 4907’ no sign at the lease road no plastic liner in the secondary containment the chart on the chart recorder is dated 10/14/16.
|