Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Producing well from both casing and tubing approximately 3” – 5” of storm water in the secondary containment the compressor was not running during the inspection digital pipeline meter on site otherwise a clean location.
|