Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Fluid level test conducted on 07/07 = Tubing - 931' @ 136 PSI, Casing - 596' @ 152 PSI, plumbing to produced water tank is disconnected and plugged, clean location in a wooded area.
|