Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Producing well plunger in the well head approximately 11” of storm water in the secondary containment the compressor was not running during the inspection the lease rights connection was disconnected from the HP Scott #2-24 well system shared site with HP Scott #2-24 other than that wise a clean location.
|