Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Met with Merit Energy to conduct fluid test. Tubing was 92 PSI and 5053 ft on fluid level. The casing was 4 PSI and 3337 ft on the fluid level. Clean location.
|