Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Met with Merit Energy to conduct fluid level test. Tubing was 140 psi and 4138 ft on the fluid level. The casing was 15 psi and 1709 ft on the fluid level. Clean site.
|