FIR 1 - INSPECTION REPORT
Permit Holder:
Standard Oil Co of LA
Well Name/No:
Umsted, Sid
Permit:
4365
Lease Name:
Umsted, Sid 23
Sec:
32
Twp:
15S
Range
15W
GPS Well Location:
Latitude:
33.37624
Longitude:
-92.67426
Field:
WILDCAT
Lease/Tank Battery:
Latitude:
0
Longitude:
0
County:
OUACHITA
Entrance from nearest 911 address, public street or highway
Status:
Completing
New not producing
Operating
Old not producing
Not found
Single well pad
Mutiple well pad
NA
Well equipment operational:
Equipment plumbed properly:
Excess equipment on lease:
Yes
No
NA
Yes
No
NA
Yes
No
Signs:
At lease entrance:
Yes
No
At tank battery:
Yes
No
NA
At well:
Yes
No
NA
Signage compliance:
Yes
No
No
Type
Construction
Size
Leaks
Remarks
No Vessels Found For This Inspection
Tank Containment:
Earthen
Metal ring
Tank in tank
No Tanks
Other
Dimensions:
Length:
0
Width:
0
Diameter:
0
Height:
0
Capacity (bbls):
0
Capacity compliance:
Breaches/Erosion:
Excessive vegetation present:
Compliance agreement:
Yes
No
NA
Yes
No
NA
Yes
No
NA
Yes
No
NA
Containment Conditions:
Fluids Present:
Yes
No
Produced fluids
Storm water
Waste oil
NA
Other
Well Site Compressor:
Yes
No
Is it in compliance?
Yes
No
NA
Trash/Debris:
Yes
No
Use as storage area:
Yes
No
Unusual equipment:
Yes
No
Excessive erosion:
Yes
No
If yes to any, explain:
Entry Gate Present:
Yes
No
Gate locked on arrival:
Yes
No
Gate locked on departure:
Yes
No
Is spill or discharge of drilling, completion or produced fluids present:
Yes
No
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
Yes
No
NA
(If yes, complete FIR 5)
Compliance Summary Remarks:
Checked the well this morning after installing the first plug and still no flow coming up out of well bore. Started in at 0730hrs to tag the plug to verify the depth of it. Tagged top of the plug at 2315ft. Added water to well and lost 2bbls. Started in with the 2nd plug(cement) at 0925hrs. Put in 30 sacks of cement from 2315ft to 2100ft. Pulled up 6 joints of tubing and reversed water flow to wash out the tubing. During the process of adding cement and reversing the water flow there was back flow coming up to the surface outside of the 24" caisson. It did stop immediately after stopping the water flow. Added water after pulling joints up to 1250ft and lost 3bbls. We let the cement set up from 1000hrs to 1400hrs. Went back in and tagged up on the 2nd plug at 2121ft at 1435hrs. Put in 30 sacks of cement from 2121ft to 1900ft at 1515hrs. Pulling out tubing and left 36 joints in the well. Closed the ram and the valve on the tubing and will tag again tomorrow.
Inspected by:
GLEN OWENS
Date:
6/9/2022 5:22:00 PM
Review for NNC or NOV:
Yes
No
If yes, check one
NNC
NOV
DNI
NA
Ref #:
Date:
__________
ADEQ referral:
Yes
No
Date of referral:
__________