Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Production well plunger in the well head no sign at the lease entrance approximately 1” – 2” of storm water in the secondary containment the secondary containment is no longer 1.1 times larger than the fluids tank the compressors were running during the inspection other than that a clean site.
Operator notified of secondary containment issues. sjg 06/13/22
|