Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Commingle test for production well the current line pressure is 14.5 PSI with the current flow rate of 242 MCF and the 24-hour flow rate was 252 MCFD a clean site.
|