Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Patches on both production tanks are leaking, wellhead corroded, no cap on pipe though containment wall. Referred to Director. sjg
|