Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
FLT for TA production well; the casing had 59.8 PSI line pressure with the fluid level at 3542' the tubing had 59.7 PSI line pressure and the fluid level was at 3544'; the well sign is laying in the ground next to the lease road; there is a plastic liner in the secondary containment; the compressor was not running during the inspection; digital pipeline meters on location; a clean site.
|