Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Fluid level test conducted on 05/06 = Tubing - 1676' @ 122 PSI, Casing - 754' @ 146 PSI, plumbing to produced water tank has been disconnected and plugged, drain plug for containment has been removed, clean location.
|