Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Witness FLT for temporary abandoned production well the casing had 4 PSI at the well head and the fluid level was 3372’ the tubing had 96 PSI at the well head and the fluid level was 5092’ no plastic liner in the secondary containment no flow meter on site.
|