Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
H2S scavenger and methanol injected producing well from both casing and tubing approximately 19” of storm water in the secondary containment the compressor was running during the inspection digital pipeline meter on location.
|