Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Witness FLT on temporary abandoned producing well the casing had 4# PSI at the well head and the fluid level was 2314' the tubing had 3# PSI at the well head and the fluid level was 1668' approximately 4" - 5" of storm water in the secondary containment no flow meter on location.
|