Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Fluid level test conducted on 05/18 = Tubing - 2381' @ 126 PSI, Casing - 1899' @ 131 PSI, plumbing to produced water tank is disconnected and plugged, clean location.
|