Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Fluid level test conducted on 05/16/16 = Tubing - 4050' @ 123 PSI, Casing - 4290' @ 123 PSI, excessive vegetation around well head and over location.
|