Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Fluid level test conducted on 05/14 = Tubing - 1707' @ 123 PSI, Casing - 604' @ 155 PSI, plumbing to produced water tank has been disconnected and plugged, clean location. NOTE: Test shows a possible hole in tubing at 856', XTO may want to re-test well for a confirmation of this FLT. Refer to KL for B-7.mp
|