Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Production well, approximately 2” of storm water in the secondary containment, containment fluids are leaking from the secondary containment through the drain plug, I called Tony H with SPC, he told me that it was not his area, but he would personally fix the leak, otherwise a clean site. Operator contacted. No enforcement at this time.MP
|