Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Not in compliance with rule B 26 B(2) legals on signs. Signs at location and at entrance have the incorrect section on them. They show 9-21 #2-13. Should be #2-12.Called 4-25-17 DNI , Bo Smith
|