Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Electric meter showing 0 production for today/yesterday. Containment 6" from full. A twig has been shoved in previous hole in containment tank. Storm water 12" above twig patch. Fluids tank floating in containment. Chart meter dated 2/2/22
not showing steady production. CNG trailer parked on location. Entry sign has been put back up since last inspection and site appears to have been somewhat weeded.
|