Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Follow-up inspection on production well from last week, when the AOGC inspector did not have the combination code to the gate lock, the code is 3030, and this is a clean location.
|