Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Containment has produced fluids which the containment walls are allowing fluids to leech through to the outside of containment. A release has occurred by the drain line of the produced fluids and drain line does not have a valve with the cap. The release of fluids have flowed 100'-200' on site to two small low/pits 1 area 5'x10' and the other 15'x45'. Several areas have standing fluids which have pooled due to the leeching from containment. Also one of leeching has allowed the flow to traveled 100'-150' on site to the county road ditch
|