Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Met with Merit Energy to conduct fluid test.
The tubing was 83 PSI and the fluid was 2441 ft.
The casing was 83 PSI and the fluid was 2308 ft.
Clean location.
|