Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
No sign at entry. Sign at well has wrong operator. Well transferred from Stephens to MMGK 02/23/22. Allow new operator time to replace sign. sjg 03/17/22
|