Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Fluid test conducted 2-28-23 Dual tubing zone upper tubing was 176 psi @ 3171 Lower tubing was 180 psi @ 4856 And the casing was 168 psi @ 3557. clean location.
|