Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Met with Hannas's pumper to conduct comingled test on site. The day rate flow was 227.6. the static was 69 the differential was at 55 temp was 59 degrees down hole it is a 3/4 inch plate with a 2 inch tube The casing pressure was 55.8. Two frac tanks still on site clean location.
|