Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Fluid level test conducted on 2/2/16 = Tubing - 5101' @ 1383 PSI, Casing - 5183' @ 1380 PSI, old foam tank and chart meter still on location, all equipment is stained from farm spraying in the area.
|