Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Fluid level test conducted on 12/22/16 = Tubing - 4770' @ 352 PSI, Casing - 4110' @ 53 PSI, AWOC is disconnected, clean location.
|