Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Fluid level test conducted 12/13/22 casing fluid depth was 3283 at 343 PSI. Vegetation heavy on site. Lease road from kibler road can no longer be used due to house that was built in the middle of it. Have to come off of pleasant valley road.
|