Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Production well, moderate vegetation inside the secondary containment, shared location with Deltic Timber #1-15H, both meters has 0 daily flow rate and 0 flow rate for 24 hours for both these wells, other than that a clean site.
RBDMS last reported production 10/1/2021.MP
|