Chemically injected producing well from casing and tubing, unknown chemical, unlabeled chemical container, plunger in the well head, plastic liner in the secondary containment, approximately 1” – 4” of storm water in the secondary containment, the compressor was running during the inspection, otherwise a clean site.
|