Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Chemically injected production well unknown chemical unlabeled chemical container plunger in the well head there is a plastic liner in the secondary containment approximately 2” - 4" of storm water in the secondary containment digital pipeline meter on site other than that a clean location.
|