Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
24 hour flow rate with open choke before test on 11/4/15 was 1034.640 MCF.
24 hour flow rate with open choke during test on 11/5/15 was 1032.279 MCF.
|