Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Fluid level test conducted on 11/16 = Tubing - 1845' @ 120 PSI, Casing - 1886' @ 47 PSI, clean location.
|