Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Fluid level test conducted on 11/15 = Tubing - 1764' @ 329 PSI, Casing - 5357' @ 153 PSI, clean location.
|