Is spill or discharge of drilling, completion or produced fluids present:
|
|
|
If yes, did spill or discharge of drilling, completion or produced fluids occur or travel off the well pad:
|
|
(If yes, complete FIR 5) |
Compliance Summary Remarks:
|
Producing well, approximately 2” – 3” of storm water in the secondary containment, the secondary containment is no longer 1.5 times larger than the fluids tank, the chart recorder box is located adjacent to the lease road by the entrance.
|